#0843
Do not treat `Vercel` or `Railway` as zero-ops production infrastructure
50radar
Managed hosting can still fail at the account and control-plane layer. Back up env vars, rehearse redeploys, and keep an exit path ready.
- A
Vercelaccount with 10 projects reportedly lost env vars, secrets, and configs. Treat dashboard state as data that needs backup. - Support response took about 2 weeks in the reported incident. Paid convenience does not guarantee incident-speed help.
- Migrating to
Railwayconsumed days, then the control plane became inaccessible. Provider switching is not a disaster plan by itself. - Direct
AWSorGCPadds setup pain, but IaC plus secret backups gives more control over recovery paths.
Source: www.reddit.com/r/SaaS/comments/1ti6v5w/never_host_your_aRead original →